RPM successfully identified water leaks across our municipality within just 10 days, which enabled us to launch a targeted leak repair program utilizing both our staff and external contractors. Once the major leaks identified are repaired, we anticipate a reduction of approximately 20% in our daily water consumption.
RPM provided professional and valued information enabling the town to develop a way forward . Their approach was deeply appreciated and their sharing of possible solutions to dealing with water leak incidents in the future was very empowering.
Facing ongoing challenges with water loss and system efficiency, the Town engaged RPM Geospatial to help identify and address leaks within our water distribution infrastructure. Throughout the project, their team demonstrated a high level of technical expertise, organization, and commitment to delivering accurate results. Their precise identification of previously undetected leaks enabled our team to take timely corrective action, resulting in measurable improvements in system performance, reduced water loss, and cost savings for the municipality. RPM maintained clear and consistent communication with Town staff, ensuring findings were well documented and easy to understand. Their professionalism and responsiveness contributed greatly to the success of the project.
RPM provided the Town of Pasadena with a leak detection report which was used to plan and make repairs to a number of water main leaks. The acoustic survey of all hydrants was impressive with all anomalies drone surveyed. We will definitely use this service in the future as part of our leak detection program.
Our Town was struggling with failing infrastructure in our water supply system leading to massive amounts of water wasted, high costs, and wear and tear on an already aging system. The municipality was unable to locate any leaks and requested assistance from RPM Geospatial. The RPM team were highly professional and used a combination of techniques to pinpoint exact locations where municipal water was flowing out into the ground and ocean. Within three days a complete assessment of the water lines was provided to the Town and the lines were fixed, the water system is now working the best it has in years!